Skip to content
M2M.globalGet early access

Magenta Telekom, Austria: 2G and 3G shutdown dates

Updated

Magenta Telekom has announced no date to switch off 2G and switched off 3G in 2024, according to the sources we checked on 26 October 2026. The table gives each source and how far we trust it; the rest of the page says what this means for IoT devices in Austria.

2G and 3G status at Magenta Telekom

NetworkStatusDateConfidenceSources and notes
2GNo plan announcednonelowmagenta.at, korewireless.com
No end date announced. The operator presents 2G as the fallback layer for older devices; Kore lists no specific 2G planning. The regulator RTR says the first Austrian 2G shutdowns could come from 2028, without naming operators.
3GSwitched off2024highmagenta.at, rtr.at
Large-scale phased switch-off started 1 Jan 2024 and was done during 2024; RTR confirms no 3G network left in Austria by mid-2025.

Confidence is high when the operator or the regulator states the date, medium when several independent sources agree, low otherwise. We recheck every month.

What it means for IoT devices on Magenta Telekom

An M2M.global IoT SIM is not tied to a single network in a country, and its data can reach your cloud without the internet through private delivery.

Other operators in Austria

Operator2G3G
A1Planned, 31 May 2028Switched off, 3 June 2025
DreiNo plan announcedSwitched off, 2025

All operators and both rules for Austria: IoT connectivity in Austria. Every country: 2G and 3G shutdown dates by country and operator.

Frequently asked questions

When does Magenta Telekom switch off 2G in Austria?

Magenta Telekom has announced no date to switch off 2G, as of 26 October 2026. No end date announced. The operator presents 2G as the fallback layer for older devices; Kore lists no specific 2G planning. The regulator RTR says the first Austrian 2G shutdowns could come from 2028, without naming operators.

When did Magenta Telekom switch off 3G in Austria?

Magenta Telekom switched off its 3G network in 2024. Large-scale phased switch-off started 1 Jan 2024 and was done during 2024; RTR confirms no 3G network left in Austria by mid-2025.