Skip to content
M2M.globalGet early access

FL1 (Telecom Liechtenstein): 2G and 3G shutdown dates

Updated

FL1 (Telecom Liechtenstein) switched off 2G in July 2026 and switched off 3G, according to the sources we checked on 26 October 2026. The table gives each source and how far we trust it; the rest of the page says what this means for IoT devices in Liechtenstein.

2G and 3G status at FL1 (Telecom Liechtenstein)

NetworkStatusDateConfidenceSources and notes
2GSwitched offJuly 2026highfl1.li
FL1 switched off its last 2G stations step by step by end of July 2026; network now relies on 4G/5G with VoLTE.
3GSwitched offnonelowfl1.li
Inferred: FL1 says devices supporting only 2G+3G can no longer connect to its network after the 2G switch-off, so no 3G service remains. No 3G shutdown date found.

Confidence is high when the operator or the regulator states the date, medium when several independent sources agree, low otherwise. We recheck every month.

What it means for IoT devices on FL1 (Telecom Liechtenstein)

An M2M.global IoT SIM is not tied to a single network in a country, and its data can reach your cloud without the internet through private delivery.

All operators and both rules for Liechtenstein: IoT connectivity in Liechtenstein. Every country: 2G and 3G shutdown dates by country and operator.

Frequently asked questions

When did FL1 (Telecom Liechtenstein) switch off 2G in Liechtenstein?

FL1 (Telecom Liechtenstein) switched off its 2G network in July 2026. FL1 switched off its last 2G stations step by step by end of July 2026; network now relies on 4G/5G with VoLTE.

When did FL1 (Telecom Liechtenstein) switch off 3G in Liechtenstein?

FL1 (Telecom Liechtenstein) switched off its 3G network. Inferred: FL1 says devices supporting only 2G+3G can no longer connect to its network after the 2G switch-off, so no 3G service remains. No 3G shutdown date found.