M1 switched off 2G in April 2017 and switched off 3G on 1 August 2024, according to the sources we checked on 26 October 2026. The table gives each source and how far we trust it; the rest of the page says what this means for IoT devices in Singapore.
2G and 3G status at M1
| Network | Status | Date | Confidence | Sources and notes |
|---|---|---|---|---|
| 2G | Switched off | April 2017 | medium | singtel.com, resources.telegeography.com M1 co-signed the joint June 2015 release (copy hosted on Singtel's site) ending all 2G services from 1 April 2017, staged to 18 April 2017. TeleGeography lists Singapore's 2G shutdown as completed in April 2017. |
| 3G | Switched off | 1 August 2024 | high | m1.com.sg, korewireless.com M1 retired all 3G services from 1 August 2024, the only Singapore MNO to keep the original July 2024 timeline. Kore lists the shutdown as finished. |
Confidence is high when the operator or the regulator states the date, medium when several independent sources agree, low otherwise. We recheck every month.
What it means for IoT devices on M1
- 2G devices no longer connect to M1. Trackers, alarms and meters that only speak GSM/GPRS need a 4G-based replacement, or a SIM that roams onto another network in Singapore still running 2G.
- 3G fallback no longer works on M1. Devices built for 3G (UMTS) or that fall back to it lose service; 4G devices with 2G fallback are not affected by this closure.
- For new devices, choose 4G-based technologies: LTE Cat-1 bis, LTE-M or NB-IoT where the network offers them.
- Foreign SIMs in Singapore: permanent roaming of foreign IoT SIMs is allowed with conditions. Details on the Singapore page.
An M2M.global IoT SIM is not tied to a single network in a country, and its data can reach your cloud without the internet through private delivery.
Other operators in Singapore
| Operator | 2G | 3G |
|---|---|---|
| Singtel | Switched off, April 2017 | Switched off, November 2024 |
| StarHub | Switched off, April 2017 | Switched off, 1 November 2024 |
All operators and both rules for Singapore: IoT connectivity in Singapore. Every country: 2G and 3G shutdown dates by country and operator.
Frequently asked questions
When did M1 switch off 2G in Singapore?
M1 switched off its 2G network in April 2017. M1 co-signed the joint June 2015 release (copy hosted on Singtel's site) ending all 2G services from 1 April 2017, staged to 18 April 2017. TeleGeography lists Singapore's 2G shutdown as completed in April 2017.
When did M1 switch off 3G in Singapore?
M1 switched off its 3G network on 1 August 2024. M1 retired all 3G services from 1 August 2024, the only Singapore MNO to keep the original July 2024 timeline. Kore lists the shutdown as finished.